Flight Phase Operational Concept Target Date Current Situation Required Performance Enabling Systems EASA Certification Document En-Route RNAV 5 (B-RNAV) 1998 Mandatory +/- 5 NM (95%) VOR/DME/ GPS/INS/ Loran AMC 20-4 Arrival / Departure RNAV 1 (P- RNAV) 2006+ Implementation +/- 1 NM (95%) DME/GPS AMC 20-16(JAA TGL10) Approach / Landing RNP APCH 2006 Implementation +/- 0.3 NM (95%) GPS AMC 20-27 RNP AR APCH Individual Implementation Implementation Depends on required accuracy <0.3 NM (95%) GPS AMC 20-26 APV Baro 2008 Implementation +/- 0.3 NM (95%) GPS/Baro AMC 20-27 APV SBAS 2010 Implementation HAL +/- 40m (10-7)VAL +/- 50m (10-7) GPS + EGNOS (SBAS) AMC 20-28 GBAS Cat I 2008 - 2015 Concept ICAO SARPs GPS + GBAS TBD GBAS Cat II/III 2012 - 2015 Concept TBD GPS + GBAS TBD Hot Links Nav Terminology RNAV Interactive Map RVSM Height Monitoring Tools Secure Area
Send comments and questions on this page to: webmaster@ecacnav.com The information in these web pages is published by EUROCONTROL - the European Organisation for the Safety of Air Navigation. © 2002-2010 EUROCONTROL. Disclaimer